SAP Certified Application Associate - Production Planning & Manufacturing with SAP ERP 6.0 EHP7
C_TSCM42_67 Exam

During a project phase, your customer raises some questions concerning parameters of the procurement type in the material master in the SAP ECC system.
Which of the following procurement type properties are valid? (Choose two)

  1. If both procurement types are allowed with entry X (both procurement types), requirements planning assumes in- house production.
  2. Procurement types E (in-house production) and F (external procurement) always have to be further refined with special procurement types.
  3. Procurement types E (in-house production), F (external procurement), or X (both procurement types) can be selected for a material independent of the material type.
  4. If procurement type E (in-house production) is set, external procurement may still be possible, depending on the material type.

Answer(s): A,D



In what sequence are the steps of material requirements planning performed in SAP ECC?

  1. 1. Net requirements calculation
    2. Lot sizing
    3. Determination of the procurement type
    4. Scheduling
  2. 1. Calculation of safety stock
    2. Lot sizing
    3. Scheduling
    4. Determination of the procurement type
  3. 1. Availability check
    2. Lot sizing
    3. Determination of the procurement type
    4. Scheduling
  4. 1. Net requirements calculation
    2. Lot sizing
    3. Scheduling
    4. Determination of the procurement type

Answer(s): A



The availability check during production order creation should use a different scope of check than during order release.
How can you fulfill this requirement?

  1. Maintain appropriate checking rules in checking control for order creation and order release.
  2. Maintain appropriate availability checking rules in the order type-dependent parameters.
  3. Maintain an appropriate availability checking group in the material master.
  4. Maintain appropriate availability checking rules in the production scheduling profile.

Answer(s): A



From what point can you no longer use the Read PP master data in the production order?

  1. After printing the order papers.
  2. After the first posting of goods movements or confirmation.
  3. From the release of the production order.
  4. After assigning the confirmed quantity of a material component due to carrying out a material availability check.

Answer(s): B




Mike M
The exams was excellent and helped me pass without any doubt.Very helpful! Thank you! I passed!
- UNITED ARAB EMIRATES
Upvote


Smart one
You guys rock. I just passed my 920-139 exam with 929 marks. Thanks for accurate & descriptive question bank.
- UK
Upvote


C J
Just to let you know, I passed my exam. Thank you,
- Mexico
Upvote


Mr. P
I just have to say a big thank you to you guys... i passed 70-552 exams with 896. You guys are the bomb! Keep the faith and the flag of being good. A big thank you once again.(10Q ALL).
- GERMANY
Upvote


Darwin
I passed the Novell 640-822 exam on this last Thursday after using your online test and IPad. This is my first experience with your exams. I'll be using your material from now on. In a few days I'll purchase my last study material for the C
- France
Upvote


Bila
Thanks! I passed 070-284 with 880 070-219 next to complete my MCSE.
- Colorado
Upvote


Passed
I just took my Certification testing for 10-184 Microsoft CRM Installation and Configuration. Your test questions definitely covered the essence of the exam material and I easily passed the exam.
- UNITED STATES
Upvote


Ed
I passed the IBM exam successfully
- UNITED STATES
Upvote


Tina
Last week I took the Citrix exam and I passed with a very high mark, more than what I expected. Thanks!!
- Israel
Upvote


Calvin B.
I just took my Certification testing for 10-184 Microsoft CRM Installation and Configuration. Your test questions definitely covered the essence of the exam material and I easily passed the exam.
- Lafayette
Upvote

Read more ...