While preparing for a new four-node cluster installation, the consultant has a Tech Review

Call with the customer. The hardware is as follows:

* 4 nodes in 1 Block

* 8 x 10 GbE Ports

* 4 x 1 GbE IPMI Ports

* Adequate Ethernet ports are available

* Ethernet cables are correct and available

* Adequate rack space is available

Which remaining item must be confirmed as available onsite?

  1. Crash Cart
  2. Fibre Channel switches
  3. Redundant 208v power
  4. Redundant 110v power

Answer(s): C



An organization is running a Nutanix Cluster based on AOS 5.10.x and VMware vSphere 6.7. Currently, the CVM network is segmented and Storage only nodes not present.

A new security project based on NSX is coming. VMware Distributed Virtual Switches are required. The administrator needs to prepare the environment for the new project.

Which step should the administrator use to initiate the project?

  1. Enable Nutanix Flow at the Prism Central Level
  2. Manually disable CVM network Segmentation
  3. Convert storage only nodes into vSphere nodes
  4. Enable Jumbo Frames to accommodate network frames

Answer(s): D



After deploying an AHV cluster connected to Cisco Nexus 9k switches, unexpected network behavior is observed. The consultant needs to rule out physical network mis- cabling without returning to the datacenter.

Which command from the host should the consultant run?

  1. show lldp neighbors
  2. show cdp neighbors
  3. show interfaces
  4. lldpctl

Answer(s): D



HOTSPOT

An administrator is configuring an All Flash cluster to support the following workloads:

· Full clone virtual desktops

· Hadoop

· Write heavy databases

Whichthree correct configuration options should the administrator use to meet the item requirements? (Choose three.)

For each procedure, indicate whether it is a correct or incorrect procedure that must be configured to meet the item requirements using the drop-down option.


  1. Please refer to Explanation below for the answer.

Answer(s): A

Explanation:




Illya
I passed my exam today with a score of 964. This was a difficult test but the preparation guide was very good. I would not have passed without the materials. Thank you very much for giving me the opportunity to better my life.
- Alberta
Upvote


Jackson
Exam syo-101 Exam I passed my exam today with no problem whatsoever. I just wanted to say a sincere thank you for the outstanding study guide. You guys are a phenomenal help when it comes to study assistance. Thanks and definitely expect to see me again.
- MJ
Upvote


CJ
Exam 1Z0-040: 1Z0-040 passed!!! I have passed my exam 59/60. You people are the boom. Thanks for the exam questions. They were so real!!
- UNITED STATES
Upvote


Oshrit
Dear Support, I passed (as you expected) the Sun Solaris Admin I (310-011) at first trial. Thank you so much.
- Israel
Upvote


Lee W.
Just thought I would let you know I took the CCDA test on Tuesday, like I planned and scored a 902!"
- China
Upvote


Micheal C.
I have used your Exams for preparation for 70-290, 70-291, 70-292, 70-296, 70-298, 70- 299, 70-300, 70-305, 70-310, 70-315, 70-316,70-320. I also passed all those on the first round. I'm currently preparing for the CCNA.
- ON
Upvote


kris J.
Now my dream has come true. I thank you a million times for the best study guides that you provided to a poor kid like me....I got it. Finally MCSE. Best regards,
- GERMANY
Upvote


Jason
I passed my CCNA exam yesterday. I would like to make some comments. "Excellent Study Guide, Excellent Support Service, Excellent Examination Web Site" Best Regards
- UNITED STATES
Upvote


Micheal
Thanks for your study guides, i have passed it. All questions in your material, we study this only 2 days. Thanks very very much!!!!!
- UNITED STATES
Upvote


L. Woo
Thanks very much for your study guides, with your help i only use 3 weeks to take the MCSE. Your study guides are very very good.
- China
Upvote

Read more ...