Specialist - Implementation Engineer, PowerStore Solutions Version 1.0
DES-1221 Exam

When planning rack layout, why should base enclosures be grouped together?

  1. Power distribution requirements
  2. Rack weight balance
  3. Ease of cable management
  4. Hot aisle requirement

Answer(s): A



What does the remote replication Failover operation do?

  1. Fully synchronizes the source and destination data states and reverses the replication direction
  2. Fully synchronizes the source and destination data states and stops the current replication session
  3. Promotes the destination system to production with its replica data consistent to the last successful RPO synchronization state
  4. Promotes the destination system to production and resets the RPO synchronization cycle in the protection policy

Answer(s): D


Reference:

https://www.dell.com/support/manuals/en-pk/powerstore-25-dae/pwrstr-protect-data/replication?guid=guid-7641aeec-982e-4e4e-85fb-c50f525635db&lang=en-us



What describes the Import External Storage feature?

  1. An external plugin feature for hosts to tune application workload IO on PowerStore NVMe based storage
  2. A native network configuration feature of PowerStore that configures external Ethernet switching for PowerStore installation
  3. A feature external to PowerStore that orchestrates vMotion movement of virtual machines onto PowerStore X systems
  4. A native data migration feature of PowerStore that imports external block storage to PowerStore

Answer(s): D


Reference:

https://www.dell.com/support/manuals/en-pk/powerstore-1000/pwrstr-import/importing-external-storage-to-powerstore-overview?guid=guid-6fef77c4-d4c9-49c6-8de2-efd67aa52ca5



What is the recommended Windows multi-pathing policy for block volumes on a PowerStore array?

  1. Least QueueDepth
  2. Round-Robin
  3. FailOver
  4. Least Weighted Paths

Answer(s): B


Reference:

https://www.delltechnologies.com/en-us/collaterals/unauth/technical-guides-support-information/products/storage-2/docu5134.pdf




seagal
I just passed (310-025) SCJP test yesterday. Your guide is right on the money and almost covers every question word for word. Great work !
- Edmonton
Upvote


Illya
I passed my exam today with a score of 964. This was a difficult test but the preparation guide was very good. I would not have passed without the materials. Thank you very much for giving me the opportunity to better my life.
- Alberta
Upvote


Jackson
Exam syo-101 Exam I passed my exam today with no problem whatsoever. I just wanted to say a sincere thank you for the outstanding study guide. You guys are a phenomenal help when it comes to study assistance. Thanks and definitely expect to see me again.
- MJ
Upvote


CJ
Exam 1Z0-040: 1Z0-040 passed!!! I have passed my exam 59/60. You people are the boom. Thanks for the exam questions. They were so real!!
- UNITED STATES
Upvote


Oshrit
Dear Support, I passed (as you expected) the Sun Solaris Admin I (310-011) at first trial. Thank you so much.
- Israel
Upvote


Lee W.
Just thought I would let you know I took the CCDA test on Tuesday, like I planned and scored a 902!"
- China
Upvote


Micheal C.
I have used your Exams for preparation for 70-290, 70-291, 70-292, 70-296, 70-298, 70- 299, 70-300, 70-305, 70-310, 70-315, 70-316,70-320. I also passed all those on the first round. I'm currently preparing for the CCNA.
- ON
Upvote


kris J.
Now my dream has come true. I thank you a million times for the best study guides that you provided to a poor kid like me....I got it. Finally MCSE. Best regards,
- GERMANY
Upvote


Jason
I passed my CCNA exam yesterday. I would like to make some comments. "Excellent Study Guide, Excellent Support Service, Excellent Examination Web Site" Best Regards
- UNITED STATES
Upvote


Micheal
Thanks for your study guides, i have passed it. All questions in your material, we study this only 2 days. Thanks very very much!!!!!
- UNITED STATES
Upvote

Read more ...